Keyboard shortcuts

Press ← or → to navigate between chapters

Press S or / to search in the book

Press ? to show this help

Press Esc to hide this help

kanbanr 0.3.0 — releases that run themselves, and sub-agents that stay in bounds

Released 21 October 2026.

Two things this release changes about how work leaves your hands. A release now moves through its stages doing what each stage is for: it prepares its own version and notes, moves main, and is tagged only once main has been pushed and CI has seen it. And when Claude hands work to a sub-agent, kanbanr now enforces what that agent may do, instead of leaving it to the brief.

No board migration is needed: 0.3.0 reads the schema-5 boards 0.2.x left.

What’s new

  • Release stages that act. Each release stage can say what must be true before a release enters it and what happens when it does: make the release branch, prepare the release, move main, tag it.
    • A release prepares itself. Entering the first stage commits the version bump in every file you name, the dated changelog heading, and draft notes from the release’s items onto release/<V>, without checking anything out. No separate item is needed to get a release ready.
    • Main moves before the tag. A stage can fast-forward main to the release without tagging, so you push main and let CI run on exactly the commit that will be tagged.
    • The cut waits for your push. The last stage can require that main is at the release and that commit is on origin/main. Until then, the Releases page shows Cut v0.3.0 greyed out and says what is missing: “push main, then wait for CI”.
    • One button per release, named for its next step, showing what it will do. The cut is one click, with its preview beside it: the commit it tags, what ships, what carries over.
    • A release with nothing in it can’t be promoted. The page says how to plan items in.
    • Set it up with kanbanr config release-stage and kanbanr config release-prepare; see what each stage does with kanbanr release stages, and what a promotion would do with kanbanr release promote <V> --plan. Projects that set nothing keep the stages they had.
    • See Processes.
  • Agent scopes: what a sub-agent may do, enforced. Before Claude starts a sub-agent, it issues a scope with one command (kanbanr scope issue build <CODE>), and puts the brief kanbanr prints at the top of the agent’s instructions.
    • The agent claims the scope in its own worktree. From then on, every board write, commit and push from there is checked against it: a build agent may record its own item’s task states and test results and commit on its item’s branch; a design agent may only read. Anything else is refused, and the refusal names the boundary it crossed.
    • Agents never push; the new pre-push hook and the commit guard refuse it.
    • What an agent records is attributed to you, “by the agent for FEAT-…”, in the activity, the events and the commit trailers.
    • If an agent’s commits run ahead of its item’s tasks, the Stop hook, kanbanr git doctor and the start of the next session name it.
    • The item’s page shows its agents, and the Workflow page lists every scope.
    • See Working with Claude.
  • The Workflow page shows how work moves. Below the stages: the sprint and how often releases are cut, with their stages in order; the git model, from where items branch to where production moves and what kanbanr merges; and every guard rail on the project, each with the command that changes it.
  • The skill says what each sub-agent may do, so the same boundaries apply in every project that uses kanbanr.

What’s fixed

  • release add <V> --branch is gone: a new release has no items yet, so it could not be promoted. Start a release with release plan, then promote it to candidate.
  • kanbanr activity now names the agent a write was made by, as the monitor does.

Upgrade notes

  1. Update with kanbanr self-update (macOS, Linux) or by rerunning the installer (Windows).
  2. Run kanbanr git install-hooks once in each project folder, to add the new pre-push hook. Issuing an agent scope needs it.
  3. Restart kanbanr serve.

Boards need nothing. Release stages that act, and agent scopes, change nothing until you set them up or issue one. Once a board holds a scope, a sub-agent’s worktree that has not claimed one is refused board writes and commits there.