Working with Claude
You can run kanbanr from Claude Code. You ask for work and answer questions, Claude records the work on the board, and you take every decision on the monitor’s pages. This chapter shows what that conversation looks like and why it asks what it asks.
Three things are worth knowing up front:
- Your workflow decides the questions. Claude doesn’t follow a script for TOGAF or Scrum. At each step it asks the board what the next stage still needs and turns each gap into a question or a draft. Change your workflow and the conversation changes with it.
- Decisions are taken on the pages. An approval, ratification, sign-off or its withdrawal, and
accepting or rejecting a decision, are taken on the Review page. Promoting or cutting a
release is taken on the Releases page. Claude tells you what is waiting there, with the
page’s address, and never records one for you: kanbanr refuses if it tries, and never asks for
one in a plan or a question. If no monitor accepts writes, Claude offers to start one with
kanbanr review --ui. - Decisions arrive filled in. What Claude already knows, such as a CI run’s link and result or what a sign-off covered, is prepared beside the button with where it came from. You check it and click, or change it first (Prepared by Claude).
- A verdict records where it was taken. The monitor, a command in your terminal and an answer recorded in a Claude Code session are told apart, and the item shows which beside each approval and sign-off. Deciding the same thing twice records nothing the second time.
- A verdict covers what you were shown. The page pins your choice to the definition you saw
(
--rev). If the definition changed in between, it refuses and you read the change first.
See the monitor for the pages.
This chapter explains how the conversation works under any process. To follow one project from setup to a shipped release, see the Process guides.
Setting up: the cadence and the git model
When Claude sets kanbanr up for a project, it asks where the board lives, which process to use, and then, for every process, whether to work in sprints and releases. It recommends the process’s own setting (on for Scrum and agile, off for the rest) and shows you the git model your answer gives before anything is written:
$ kanbanr git model --sprints on --releases off
topology: sprints
main: main
line: none — start a sprint to have one
branch at: sprint/<SP>
production: at the sprint close
…
kanbanr merges (once the model is on):
- each item branch into sprint/<SP> when the item enters the integrate stage (--no-ff, naming the item)
- sprint/<SP> into main when the sprint closes (a fast-forward, tagged with the sprint's code)
- sprint/<SP> into each item branch carried into that sprint (a catch-up merge; a conflict is reported for that item)
pushing: never automatic — you review and push
automation: on
Choosing sprints or releases turns the git model on.
The plan quotes that output under Branching, lists which stage holds each role (design, build, integrate, release) under Process, and says that the method’s gates are on. Approving the plan applies it. What each role then asks for is in The method by stage role.
Start with agile unless your team already has a process of its own. Not sure which process to pick? Choosing a guide lists every process and its guides, and Processes compares them and their gates.
Starting work: a definition you approve
Ask for what you need, in your own words:
A shopper opens their basket on our shop’s web page, leaves, and comes back the next day to find what they chose still there.
Claude reads the charter and the code, then asks only what it can’t work out, a few questions at a time:
Which goal does this serve? ● G-1 A customer can pay for a basket on their own ○ a new goal
Who is it for? ● returning shoppers ○ guests too ○ other…
The definition it writes is the item’s brief: a one-line statement, the goals it serves, the six dimensions, EARS requirements each naming its test, and the stage it starts in. It goes only as far as the first stage asks, unless you ask for the whole definition up front.
Choices are yours. Anything you’d recognise as a decision (a business rule, a retention period, a limit, what’s in or out of scope) is asked before the definition is written, with Claude’s recommendation first. Anything Claude still had to choose is listed in the brief under “Choices I made”, so your approval is informed. If one request spans several stages, the brief says which ones it covers.
Claude writes the definition to the board, shows you its brief in a few lines, and says it is waiting for your approval on the Review page, with the link. Nothing is recorded as approved until you approve it there.
Deciding: on the Review and Releases pages
When decisions are waiting, the session start mentions them. Claude says in one message how many there are, which, and the address of the page where they wait. It doesn’t list them as questions. If you ask it to explain one, it does, and sends you back to the page.
| You decide | Where |
|---|---|
| Approve a definition, or ratify work done under a recorded override | Review page |
| Sign off a stage (for example release) | Review page |
| Accept or reject a proposed design decision | Review page |
| Withdraw an approval or a sign-off | the item’s page |
| Promote or cut a release, and confirm each stage after the tag | Releases page |
| Change it | tell Claude what to change: it revises the definition, and the item comes back to the queue |
Checks that need a push are marked to be checked after it; Claude records them once CI has run; anything still unchecked at the cut waits for you to accept it, and the notes say so. An override Claude makes past a gate waits on the Review page for you to ratify, and the item doesn’t ship until you do.
Claude may run kanbanr release promote <V> --plan, kanbanr sprint close and
kanbanr release plan, which record no verdict. If a verdict was ever recorded that you did not
give, Claude says so at once and asks you to withdraw it on the item’s page.
Where decisions are taken, and delegating them
Each project chooses where its decisions are taken. In monitor mode, the default, every decision is yours, on the Review and Releases pages, as above. In delegated mode you still decide there, and Claude may also take the decisions you have delegated to it, for a time.
To delegate, tell Claude what it may decide, for example: “you can sign off the design review of small defects for the next two weeks”. Claude proposes a delegation: which verdicts (approve, ratify, or a named sign-off), for which items, kinds of item, milestone or stages, and until when (two weeks unless you say otherwise, three months at most). A proposal does nothing until you grant it: it waits in the Decisions here panel at the top of the Review page, where you grant it or discard it, and where you switch the project to delegated mode. Only you can grant one, change the mode, or review what was decided; kanbanr refuses Claude all three.
When you set a project up, Claude proposes the delegations its process usually wants, and the setup plan shows them under Decisions: for most processes, the design review of defects and chores, and the docs fold-in of every item; for TOGAF, only the docs fold-in, so Business Architecture and System Design stay yours; for design control, none. Each covers the stage an item is in when that sign-off is asked: a sign-off named for a stage, such as the fold-in “at Migration”, is the one for the move into it, so it is taken in the stage before. Only forward moves are delegated: when an item has moved back to an earlier stage, Claude asks you before deciding or changing anything for it, even if a delegation would cover it. You grant them on the Review page after setup, or don’t.
Auto mode. If Claude Code runs in auto mode, its safety check can stop a delegated command such
as kanbanr signoff … --under DLG-001 before kanbanr sees it, because the check cannot know you
granted the delegation. When you grant a delegation in delegated mode, kanbanr offers the one
allow rule that lets the command through, on the Review page and after kanbanr decisions grant.
Say yes when Claude asks, or run kanbanr claude permissions --write yourself: it adds
Bash(kanbanr signoff:*) (one rule per delegated verb) to the project’s
.claude/settings.local.json, which is this machine’s and is never committed. Without the rule,
Claude prepares the decision for your click instead. kanbanr’s own guard is unchanged, so a rule
left behind lets nothing through once the delegation ends.
When Claude takes a decision under a delegation, it tells you which one and under which delegation,
and the decision is recorded as delegated, by Claude, naming the delegation. It comes back on the
Review page under Delegated decisions to review: Keep it, or Undo it, which withdraws
it with a reason that names the delegation. Until you do, a release holding the item shows it as a
warning beside its promote button and in kanbanr release promote --plan; it never blocks the
release. A delegation can’t cover a release, a withdrawal, a
design decision (ADR) or the decisions settings themselves, and only the Claude you are talking to
acts under one, never a sub-agent it briefs. Revoke a delegation on the same panel at any time;
switching back to monitor mode suspends them all.
Outside a delegation nothing changes: a verdict run inside a Claude session is refused by kanbanr itself, not only by its hook. This keeps Claude to what you delegated through kanbanr’s own commands and hooks, and makes any departure visible; it is not a security boundary against a program running as you.
Plan mode
Claude uses plan mode for the setup interview and for designing or changing your process. It never uses it for a routine move or a new item, and never while a sub-agent is running, because entering it pauses the agent.
While agents build, Claude tells you only what changed: a task landed, a failure, a stall, a decision waiting. It sends nothing for a report that repeats one it gave. Rework goes on the item’s todo-list before anyone starts it, and kanbanr refuses a build scope for an item with no open task.
Moving work: just ask
Park FEAT-074, we’re not doing it this quarter.
Put FEAT-150 back to Planned.
Claude runs kanbanr move. If a stage’s gate refuses, Claude says what the stage still needs and
offers to work through it, using the table below. To run a command yourself without leaving
Claude Code, start the line with !:
! kanbanr move FEAT-074 Deferred
Sub-agents and agent scopes
When Claude splits work across sub-agents, a design agent to draft, build agents in their own git worktrees to write the code, each agent’s limits are not left to its brief. Claude issues each one a scope first, and kanbanr enforces it (FEAT-214):
kanbanr scope issue build FEAT-214 # --for 8h by default, 72h at most; --note "T1–T4"
The command records the scope on the board (who issued it, the item, what it allows, the item’s
branch, when it expires) and prints the boundary table Claude pastes at the top of the agent’s
brief. The agent starts in its own worktree (isolation: worktree), and its first command is the
one the brief names, kanbanr scope claim SC-007. The claim binds the scope to that worktree, on
the board and in a pointer file in the worktree’s own git directory, and switches a build agent to
its item’s branch.
From then on, in that worktree:
| A build scope | A design scope | |
|---|---|---|
| Board writes | its own item’s task states and test evidence; a batch only of those | none |
| Commits | on its item’s branch, each naming its item | none |
| Pushing | never: kanbanr sync, git push and the board’s push policy are all refused | never |
identity, hooks, migrate, serve --allow-writes, start, finish, … | refused | refused |
A refusal names the scope and the boundary it crossed:
refused by agent scope SC-007 (build, FEAT-214): `move feature FEAT-214` is not one of its
operations. Under this scope you may: `kanbanr task state FEAT-214 …`, `kanbanr test FEAT-214 …`,
commits on feat/FEAT-214-agent-scopes naming FEAT-214. Report what you needed to the coordinator; do
not work around it.
A worktree under .claude/worktrees/ whose name starts with agent-, the name Claude Code gives an
agent’s, is refused every write and commit while no scope is bound to it. A worktree you or the
coordinator make there for your own work, such as one to resolve a merge, takes any other name and
commits under the ordinary hooks; once a scope is bound to a worktree, it holds whatever the
worktree is called.
When the agent finishes its item’s last task, the item stays where it is: Claude moves it. Every
write and commit an agent makes is recorded as you, by the agent for its item: on the activity
entry and the event, and as an Agent-Scope: trailer on the board commit and the code commit.
Claude keeps an eye on the agents’ branches: kanbanr scope drift names a build agent’s commits
that are newer than its item’s last task change, and so do the Stop hook, session start and
kanbanr git doctor. A merge that catches the branch up with its sprint, a release or main, and what it brings in, is not drift. When the agent’s work has been reviewed, Claude revokes its scope
(kanbanr scope revoke SC-007 --reason done); kanbanr scope list shows the ones in force, and
kanbanr scope renew SC-007 --for 4h extends one. Your own checkout is never scoped.
A scope binds the agent it was issued to, never whoever stands in its folder. The three hooks
(the Bash guard, the Write guard and test capture) tell a sub-agent’s calls, which carry an
agent_id, from Claude’s own, and a command run in your own terminal is not an agent’s at all. So a
scope never governs you or Claude’s session, and a revoke stops the agent on its next tool call and
frees every other shell at once. Issuing a scope therefore needs those hooks: kanbanr hooks install. Claude stays in the project folder and looks inside an agent’s worktree with git -C <path>, make -C <path> or npm --prefix <path>; a cd into one is refused, with the way out
named.
Scopes guard against mistakes and casual crossings, not a hostile process: the agent runs as you,
with your file permissions. A script that leaves the worktree, a commit with its hooks switched off
inside a script, or a hand edit to the board’s scopes.yaml is not stopped, though every scoped
write carries its agent and a trailer, so an unattributed change stands out in the history.
A board that holds scopes is governed wherever it is, so setting TMPDIR does not make it look
like a test board; only a board in the temporary directory that holds no scopes is exempt.
Why it asks what it asks
Claude asks the board, kanbanr check <CODE> --json, what each possible next stage still lacks.
The answer comes from your workflow’s gates: the stage’s purpose, the failing
checks, the warnings, and the sign-offs needed. Each kind of check becomes one kind of action, the
same in every workflow:
| Check | What Claude does |
|---|---|
definition | drafts the definition into the plan |
statement | drafts the one-line statement into the plan |
goals | proposes the goal it serves, from your charter; asks if it isn’t clear |
goals_known | asks about a goal the charter doesn’t have, or offers to add it |
zachman | drafts the dimensions the stage names (what, how, where, when, who, why); asks what it can’t infer |
requirements | drafts EARS requirements into the plan |
ears | rewrites a requirement into EARS form |
quality | drafts the quality scenario, and asks for the target (for example “300 ms at p95”) |
tests_named | names a test for each requirement |
spec_sections | drafts each named section of the spec into the definition; for Design, the build-ready design and its implementation task list |
docs_updated | folds the item’s design into each doc in affects_docs before the move, and says which docs it changed |
diagrams_valid | fixes each Mermaid diagram the lint names, in the spec or a doc in affects_docs, then runs kanbanr doctor to confirm none is left |
docs_cover | adds a link to the item in each view doc a coverage rule names (the Zachman matrix, the catalog), then moves; it never asks you |
small | proposes splitting the item |
approved | your approval on the Review page; Claude says it is waiting and links to it |
bypass | your ratification on the Review page |
signoff | a “Sign off name” question |
estimated | a question: how big, in your project’s unit (points or days) |
in_sprint | a question: plan it into the running sprint, or start its sprint today? |
in_release | a question: which planned release? |
tests_green | never a question: evidence decides; Claude reports what isn’t green yet and makes it green |
A warning goes into the plan as a choice: fix it, or go ahead with the warning on record. When
more than one next stage is possible, Claude asks which. Each plan is headed with the stage’s own
purpose from your configuration.
So if you edit your process (say, to ask when a feature happens at your business-architecture stage), Claude starts asking “When does this happen?” there, with nothing else to change.
A worked example: one feature through TOGAF
The TOGAF preset runs Vision → Business Arch → System Design → Implementation → Migration → Operations, and the definition grows phase by phase. The gate output below is what kanbanr prints.
Vision. A statement and the goal. You accept a short plan; Vision has no gate, so nothing needs approval yet.
Business Architecture. The board reports:
→ to move to Business Arch (Who it is for, what it must do, and why — the behaviour, as requirements.), still needed:
no requirements · not approved · [MISSING: What] [MISSING: Who] [MISSING: Why]
Claude drafts who, what and why and the requirement (“WHEN a shopper returns within 7 days, THE SYSTEM SHALL restore their cart.”), asks what only you can decide (“any device, or only the same browser?”), and you approve the definition on the Review page. That’s approval 1.
System Design. Now only [MISSING: How] [MISSING: Where]. Claude proposes the design and checks
it against the requirement you agreed: “server-side storage keyed by account satisfies R-1 across
devices; browser storage would not”. It asks for a quality target. The definition grew, so the
earlier approval stands, since text was only added, and the additions are reviewed at the next
decision, the design review. Nothing to approve here. The gate’s warning (R-2 is a quality requirement with no scenario) is in the plan for you to fix or accept. The architecture
decision is drafted as proposed for you to accept.
Implementation.
→ to move to Implementation (Build it, with a test named for every requirement.), still needed:
R-1 has no test — it cannot be shown to be met
R-2 has no test — it cannot be shown to be met
Claude names the tests and asks once: Approve / Change it / Skip. That’s approval 3. The branch is created here, so code starts only after the design was agreed.
Migration. No question: the move waits until the tests are green.
Operations. One question, “Sign off release?”, with the tests re-checked.
Your part, in all: a short plan, two design plans, and three one-click questions. Each approval covers more than the one before, and the item’s history keeps the trail. If you already know the design, ask for the whole definition up front: one plan and one approval then cover every stage where nothing changes.
For a whole project on TOGAF with sprints and releases, from setup to a shipped release, see TOGAF with Claude.
What it looked like in practice
The guides are checked on every release by walkthroughs that run themselves: kanbanr walkthrough run drives a Claude Code session through a guide’s runbook on a scratch project, takes each
decision on the scratch board as the person would, and leaves you one batch of results to confirm
with one click. See Walkthroughs that run themselves.
These are from the walkthroughs that tested this flow before it shipped, on a TOGAF project and on a project with its own process file:
- One request, two stages. “Take saved carts to business architecture, then design it” produced one plan covering both stages. Accepting it approved the definition at each stage, and the item went Vision → Business Arch → System Design, through each gate in turn.
- Choices asked first. Before the plan for named baskets, Claude asked about renaming, items no longer for sale, and deleting. The plan then listed what it had still chosen itself (“a named basket is a snapshot”) under Choices I made.
- A drafted decision, asked at once. The design decision behind saved carts came up as Accept / Reject / Later, not as a command to type.
- A review with Change it. Two items were waiting. Approve recorded the first. “Change it — no cap on named baskets” removed the cap. That put the definition back to text already approved, so the earlier approval counted again and nothing new was asked: approvals follow the content, not the edit history.
- The process decides the questions. The project whose own process file asks when at its shaping stage was asked “when does this happen?” there. The TOGAF project, whose gates never ask it, was not, and left How and Where blank until its System Design stage asked for them.
Your own process, designed in the conversation
At setup, or whenever you say “let’s change our process”, Claude designs the process with you instead of asking for a file. It offers the processes your team already saved first. For a new one it starts from the closest built-in process. Then it asks one question per stage, what must be true before work enters it?, with only the checks kanbanr can enforce as choices; anything else becomes a named sign-off. The plan shows the result as a working agreement and a diagram, and accepting it saves the process (on the board for the team, or in your personal library) and applies it.
When a saved process changes, each project using it is told: at the start of the next session, Claude mentions it once and asks whether to update. It never updates on its own. See Processes.
In other workflows
The same conversation, with only as many decisions as each workflow asks for:
| Workflow | Your decisions per item | Guide |
|---|---|---|
| default (Kanban) | approval and design-review to start; docs-folded to complete. The move to Completed doesn’t ask for green tests, so ask Claude to record them first | Default |
| scheduled | approval and design-review to schedule; docs-folded to complete. Completed doesn’t ask for green tests either | Scheduled |
| PDCA | approval and design-review at Do; docs-folded at Check; a review sign-off at Act | PDCA |
| design control | approval and design-review at Design; verification-review before Verification; docs-folded at Validation; validation to reach Released | Design control |
| Scrum | its size as a question at Ready (the Definition of Ready); approval, design-review and its sprint to start; green tests and docs-folded for Done; the release is yours to promote and cut | Scrum |
| agile | approval at Design; design-review at Develop; green tests and docs-folded at Review; the release is yours to promote and cut | Agile |
| your own process | whatever its gates ask, as the table above |
For the whole journey under one process, including its sprints and releases, see the Process guides.