Keyboard shortcuts

Press ← or → to navigate between chapters

Press S or / to search in the book

Press ? to show this help

Press Esc to hide this help

Designing CI and the release workflow

Design your pipeline before your first release, not during it. A release workflow can only be tested by running it, a tag can’t be moved once it’s pushed, and shipped release notes can’t be edited. So a mistake in the pipeline costs a whole version number, and a first release often takes three or four tries. A few checks beforehand avoid most of them.

This page applies to every process that has releases: TOGAF, Scrum and Agile. The words below don’t depend on which remote server, CI service or package registry you use.

Ask Claude to design it with you

Design the CI and the release workflow for this project, before the first release. Propose separate stages I can rerun one at a time, with caching for our stack, on one platform to start. Tell me which checks our plan can’t run. Use the release notes kanbanr wrote as the release description. Add a manual run that builds everything and publishes nothing.

Claude proposes the pipeline and brings you the choices. You approve it like any other design, and it becomes an item on the board, so it has a definition, a test and an approval of its own.

What to settle before the first tag

  1. Start small, in stages. Keep the first pipeline small by covering one platform and a few checks, not by putting everything in one job. Then:

    • Each stage is its own job: lint (format and lint), test, build, then scan and publish in the release workflow. A failed stage can be rerun alone, and the jobs after it wait for it.
    • Build once and pass it on. A stage hands what it built to the next as an artifact. The publish stage publishes the files the build stage made and never rebuilds them.
    • Cache by lock file. The dependency and build caches are keyed on the lock files (and the toolchain file), and saved only from main. A pull request reads main’s cache and never writes its own.
    • Set a timeout on every job, so a hung test fails within the hour instead of holding a runner.
    • Cancel a run a newer push made pointless, except a release run.
    • Add more platforms, container images and scanners after the first release, one at a time, each as its own item and its own stage.

    A pipeline that is green and small is worth more than a complete one that has never run.

    Speed-ups by stack, which Claude offers for the stacks the project uses:

    StackCache keyed onSpeed-ups
    RustCargo.lock, rust-toolchain.tomla cache of the registry and target/; sccache for compiled crates; cargo-chef for an image’s dependency layer; no incremental builds or debug info in CI; cargo-nextest to run tests side by side
    Pythonthe lock or requirements filesthe pip cache (or the installer’s own)
    Nodepackage-lock.json (or the lock file in use)the npm cache, and npm ci
    Container imagesthe Dockerfile and the lock filesa layer cache for the image build, one per image

    Which rows apply comes from the stack in the design, and from the project’s baseline once FTR-033 is built.

  2. Check what your plan allows. Some checks only run on certain plans or settings. A code scanner may be unavailable for a private project, and a package registry may need a setting on your account before it accepts a push. Claude can’t see your account settings, so it asks you, and you look. Leave out any check you can’t run, and add it back when you can.

  3. Take the release description from kanbanr’s notes. Promoting a release to its first stage drafts the notes, and you and Claude rewrite them for readers. Tell Claude to make the pipeline publish those notes as the description. A pipeline that generates its own description from commits will ignore everything you wrote.

  4. Run the release workflow without a tag. Ask for a manual trigger that runs every step up to publishing and publishes nothing. Run it on main before you cut the release, and again whenever the workflow changes. It finds the mistakes that checking the file by eye cannot, such as a step that downloads the wrong files.

  5. Run each check once per commit. If both a push to main and a push of the tag start the same checks, the second run is wasted time. Decide which runs where.

  6. Run the product the way a person will. Test the built result from another machine or address, not only from the one that built it. A container that calls its own machine by name passes every check on the machine that made it and fails everywhere else.

  7. Record CI before you cut. kanbanr can see that main was pushed. It can’t see whether CI passed. The Cut waits until a CI result is recorded for main’s commit, on the Releases page. Claude reads the run and prepares the result with its link; you check it and click Record ci passed.

  8. Mark the checks that need a push. A requirement that only CI can show (the job runs, a tag publishes the notes) gets at: pushed on its test, or at: cut. The item’s gate doesn’t wait for it, so Promote to main isn’t held; Claude records the result once CI has run. Anything still not run at the cut waits for you to accept shipping it unverified, and the notes name it.

Where it fits

WhenWhat
When you plan the first releaseClaude proposes the pipeline item (if setup recorded CI); you approve it like any other design
During setup or the first sprintAsk Claude to design the pipeline, and approve it
Before Promote to mainRun the release workflow without a tag, and fix what it shows
After you push mainWait for CI to go green, check the result Claude prepared and click Record ci passed, then Check again and Cut
After you push the tagWait for the release workflow, and check the release page has your notes

If the pipeline needs a fix after the cut, that is a patch release. See Patch releases.