Scheduled, from the command line

This guide takes one item through the scheduled process (Planned, Scheduled, Completed) with you running each command. To work by talking to Claude instead, see Scheduled with Claude.

The commands and output come from a real run on a scratch project. <tmp> stands for a temporary folder.

The process

flowchart LR
  A["Planned"] -->|"start"| B["Scheduled"]
  B -->|"move"| C["Completed"]
  A -.-> D["Deferred"]
StageWhat must be true to enterCommands
PlannedNothing: items start herekanbanr feature add
ScheduledA definition, approval, a ## Design section in the spec, the design-review sign-offkanbanr feature define, kanbanr feature edit, kanbanr signoff, kanbanr approve, kanbanr start
CompletedThe docs-folded sign-off. The move merges the item’s branchkanbanr signoff, kanbanr move

Deferred is a parking place. So are No Action, Not Applicable and Out-of-Scope. There are no sprints or releases: nothing is tagged, and an item is finished when its branch merges into main.

Setting it up

In your project folder:

kanbanr init shop --data-dir <tmp>/shop-board --author Ada --email ada@example.com
kanbanr config workflow --preset scheduled
kanbanr config cadence --git-model on
kanbanr git install-hooks
workflow updated
sprints off, releases off, estimates in days
installed commit-msg and pre-commit and pre-push in <tmp>/shop: a commit now has to say which item it serves

kanbanr git model shows what will happen. There is one line, main, and no sprint or release branches:

topology:   trunk
main:       main
line:       main
branch at:  main
production: at the integrate merge
items:      feat/{code}-{slug}, fix/{code}-{slug}, spike/*
protected:  main, sprint/*, release/*
kanbanr merges:
  - each item branch into main when the item enters the integrate stage (--no-ff, naming the item)
pushing:    never automatic — you review and push
automation: on — start, sprints and the hooks follow this model

Agree a charter before creating items, because gates are not enforced without one. A move that should be refused still succeeds, but says what the gate would have needed and that kanbanr charter set turns the gates on:

kanbanr charter set --file <tmp>/charter.yaml
charter saved for 'shop': 1 goal(s) G-1

Creating the item

kanbanr milestone add --name "Carts"
kanbanr feature add --title "Restore the cart" --milestone MS-001 --spec "# Restore the cart"
created milestone MS-001
created FEAT-001 (Planned)

Planned to Scheduled

Ask what is missing:

kanbanr check FEAT-001
✗ FEAT-001 Restore the cart
    no definition — why it exists, what must be true, how it is verified (`kanbanr feature define`)
    → to move to Scheduled, still needed:
        no definition — why it exists, what must be true, how it is verified (`kanbanr feature define`)
        the spec has no 'Design' section — add it as a heading, with its content
        no sign-off 'design-review' — `kanbanr signoff FEAT-001 design-review`

0/1 ready

kanbanr start makes the item’s branch and moves the item if its gate is met. If it isn’t, it says what’s missing and makes no branch:

kanbanr start FEAT-001 --to "Scheduled"
error: unsupported operation: cannot move FEAT-001 to 'Scheduled': no definition — why it exists, what must be true, how it is verified (`kanbanr feature define`); the spec has no 'Design' section — add it as a heading, with its content; no sign-off 'design-review' — `kanbanr signoff FEAT-001 design-review`. To proceed anyway, record why with --override "<reason>"

Meet each gap. Write the definition, add a ## Design section to the spec, and give the design-review sign-off:

kanbanr feature define FEAT-001 --file <tmp>/definition.yaml
kanbanr feature edit FEAT-001 --spec-file <tmp>/spec.md
kanbanr signoff FEAT-001 design-review
defined FEAT-001: 1 requirement(s)
updated FEAT-001
FEAT-001: sign-off 'design-review' recorded by Ada

Approval is still needed. The refusal says so:

kanbanr start FEAT-001 --to "Scheduled"
created feat/FEAT-001-restore-the-cart from main
error: unsupported operation: cannot move FEAT-001 to 'Scheduled': not approved. To proceed anyway, record why with --override "<reason>"
kanbanr approve FEAT-001
kanbanr start FEAT-001 --to "Scheduled"
FEAT-001 approved by Ada
created feat/FEAT-001-restore-the-cart from main
FEAT-001 -> Scheduled

The work

Work on the item’s branch and commit with kanbanr commit, which adds Refs: kanbanr:FEAT-001:

git add -A
kanbanr commit -m "feat: restore the cart"
[feat/FEAT-001-restore-the-cart 88f968e] feat: restore the cart
 1 file changed, 1 insertion(+)
 create mode 100644 cart.txt

Scheduled to Completed

kanbanr move FEAT-001 "Completed"
error: unsupported operation: cannot move FEAT-001 to 'Completed': no sign-off 'docs-folded' — `kanbanr signoff FEAT-001 docs-folded`. To proceed anyway, record why with --override "<reason>"

Give the sign-off, then move. The move merges the branch into main:

kanbanr signoff FEAT-001 docs-folded
kanbanr move FEAT-001 "Completed"
FEAT-001: sign-off 'docs-folded' recorded by Ada
FEAT-001 -> Completed
merged feat/FEAT-001-restore-the-cart into main (9837a0e70aa0)

Your checkout stays on the item’s branch. The history shows the merge naming the item:

*   9837a0e Merge feat/FEAT-001-restore-the-cart into main
|\
| * 88f968e feat: restore the cart
|/
* 0df855e select the board
* 403525e first commit

Nothing was pushed. Review, then git push origin main yourself.

When things go wrong

You seeIt meansDo this
cannot move … to 'Scheduled': not approvedThe definition has no approval, or it lapsedkanbanr approve FEAT-001
the spec has no 'Design' sectionThe build stage needs a design in the specAdd a ## Design heading and content with kanbanr feature edit
no sign-off 'docs-folded'The merge stage needs a person’s sign-offkanbanr signoff FEAT-001 docs-folded
R-1 has tests but none is green from kanbanr checkA requirement isn’t provenRecord a passing test. See the note below
kanbanr doctor says the item’s branch is mergedThe branch is no longer neededgit branch -d feat/FEAT-001-restore-the-cart

A move can also go past its gate with --override "<reason>", and the reason stays on the item. Save it for real exceptions.

Note. In the run above, kanbanr check still said R-1 has tests but none is green after the item was Completed. The move was allowed, so a manual kanbanr move didn’t ask for green tests. Don’t rely on it: record the test results before you move.