PDCA from the command line

This guide takes one item through Plan, Do, Check and Act with you running each command. To work by talking to Claude instead, see PDCA with Claude.

The commands and output come from a real run on a scratch project. <tmp> stands for a temporary folder.

PDCA uses no sprints or releases by default. There is no cut: an item is done when it reaches Act.

Setting it up

In your project folder, which is a git repository:

kanbanr init shop --data-dir <tmp>/shop-board --author Ada --email ada@example.com
kanbanr config workflow --preset pdca
kanbanr config cadence --git-model on
kanbanr git install-hooks
workflow updated
sprints off, releases off, estimates in days, git model off
installed commit-msg and pre-commit and pre-push in <tmp>/shop: a commit now has to say which item it serves

kanbanr git model shows what the git model will do. With no sprints, work merges straight into main. Nothing is pushed for you:

topology:   trunk
main:       main
line:       main
branch at:  main
production: at the integrate merge
items:      feat/{code}-{slug}, fix/{code}-{slug}, spike/*
protected:  main, sprint/*, release/*
kanbanr merges:
  - each item branch into main when the item enters the integrate stage (--no-ff, naming the item)
pushing:    never automatic — you review and push
automation: on — start, sprints and the hooks follow this model

The charter comes first

The gates are not enforced until the project has a charter, and an item created before the charter was adopted is exempt from them. Without one, moves that should be refused still succeed, but each says what the gate would have needed and that kanbanr charter set turns the gates on. So agree the charter before creating any items:

kanbanr charter set --file charter.yaml
charter saved for 'shop': 1 goal(s) G-1

The stages

StageWhat must be true to enterCommands
PlanNothingkanbanr feature add
DoA definition with statement, goals, requirements and a test named for each; approval; a ## Design section in the spec; the design-review sign-offkanbanr feature define, kanbanr feature edit, kanbanr signoff, kanbanr approve, kanbanr start
CheckEvery requirement proven by a green test; the docs-folded sign-offkanbanr test, kanbanr signoff, kanbanr move
ActThe review sign-offkanbanr signoff, kanbanr move

Plan

kanbanr milestone add --name "Carts"
kanbanr feature add --title "Restore the cart" --milestone MS-001 --spec "# Restore the cart"
created MS-001
created FEAT-001 (Plan)

Do

kanbanr check says what the next stage still needs:

kanbanr check FEAT-001
✗ FEAT-001 Restore the cart
    no definition — why it exists, what must be true, how it is verified (`kanbanr feature define`)
    → to move to Do (Make the change as planned.), still needed:
        no definition — why it exists, what must be true, how it is verified (`kanbanr feature define`)
        the spec has no 'Design' section — add it as a heading, with its content
        no sign-off 'design-review' — `kanbanr signoff FEAT-001 design-review`

0/1 ready

kanbanr start makes the item’s branch and moves the item if its gate is met. If it isn’t, it says what’s missing and makes no branch:

kanbanr start FEAT-001 --to "Do"
error: unsupported operation: cannot move FEAT-001 to 'Do': no definition — why it exists, what must be true, how it is verified (`kanbanr feature define`); the spec has no 'Design' section — add it as a heading, with its content; no sign-off 'design-review' — `kanbanr signoff FEAT-001 design-review`. To proceed anyway, record why with --override "<reason>"

Write the definition, add the design to the spec and record the design review:

kanbanr feature define FEAT-001 --file definition.yaml
kanbanr feature edit FEAT-001 --spec-file spec.md
kanbanr signoff FEAT-001 design-review
defined FEAT-001: 1 requirement(s)
updated FEAT-001
FEAT-001: sign-off 'design-review' recorded by Ada

Starting again is still refused until you approve:

created feat/FEAT-001-restore-the-cart from main
error: unsupported operation: cannot move FEAT-001 to 'Do': not approved. To proceed anyway, record why with --override "<reason>"
kanbanr approve FEAT-001
kanbanr start FEAT-001 --to "Do"
FEAT-001 approved by Ada
created feat/FEAT-001-restore-the-cart from main
FEAT-001 -> Do

Adding keeps your approval; changing lapses it. Text added to the definition is reviewed at the next decision. If you change or remove approved text, approve it again.

Do the work, then commit with kanbanr commit, which adds Refs: kanbanr:FEAT-001 to the commit:

kanbanr commit -m "feat: restore the cart"
[feat/FEAT-001-restore-the-cart 9a5061a] feat: restore the cart
 1 file changed, 1 insertion(+)
 create mode 100644 cart.txt

Check

The move is refused until the requirements are proven and the docs are folded in:

kanbanr move FEAT-001 "Check"
error: unsupported operation: cannot move FEAT-001 to 'Check': R-1 has tests but none is green — not yet proven; no sign-off 'docs-folded' — `kanbanr signoff FEAT-001 docs-folded`. To proceed anyway, record why with --override "<reason>"

Record the test result against the commit it ran on, give the sign-off and move:

kanbanr test FEAT-001 R-1 "cart_restores_after_return" green --rev 9a5061a96d32f217bcdad0c4013554298b7607c5
kanbanr signoff FEAT-001 docs-folded
kanbanr move FEAT-001 "Check"
FEAT-001/R-1 · cart_restores_after_return -> green
FEAT-001: sign-off 'docs-folded' recorded by Ada
FEAT-001 -> Check
merged feat/FEAT-001-restore-the-cart into main (52dd737ee47d)

Check is where the merge happens. The item’s branch is merged into main. Your checkout stays on the item’s branch.

Act

kanbanr move FEAT-001 "Act"
error: unsupported operation: cannot move FEAT-001 to 'Act': no sign-off 'review' — `kanbanr signoff FEAT-001 review`. To proceed anyway, record why with --override "<reason>"
kanbanr signoff FEAT-001 review
kanbanr move FEAT-001 "Act"
FEAT-001: sign-off 'review' recorded by Ada
FEAT-001 -> Act

Act is the end of the cycle:

kanbanr board
# shop board

## Plan (0)

## Do (0)

## Check (0)

## Act (1)
  - FEAT-001 Restore the cart [0/0]

The history shows the merge on main:

*   52dd737 Merge feat/FEAT-001-restore-the-cart into main
|\  
| * 9a5061a feat: restore the cart
|/  
* 1f0a61c select the board
* 403525e first commit

Push main yourself when you are ready: git push origin main. kanbanr never pushes.

When things go wrong

You seeIt meansDo this
Moves succeed that shouldn’tNo charter, or the item predates itSet the charter before creating items
not approvedThe definition was never approved, or changed sincekanbanr approve FEAT-001
the spec has no 'Design' sectionDo needs a build-ready designkanbanr feature edit, then kanbanr signoff FEAT-001 design-review
none is green — not yet provenA requirement has no passing testRun the test, then kanbanr test
no sign-off 'review'Act needs a person’s reviewkanbanr signoff FEAT-001 review
doctor says the branch is mergedThe item is finishedgit branch -d feat/FEAT-001-restore-the-cart

A move can also go past its gate with --override "<reason>", and the reason stays on the item. Save it for real exceptions.