Reasoning, evidence and traceability

Reasoning, evidence and traceability (MS-006)

The board above records what is being built. This layer records why it exists, what must be true, and what proves it — and, deliberately, records nothing it cannot derive.

The graph

charter.purpose
  └── G-2  goal
       └── FEAT-046  item              definition.goals: [G-2]
            ├── R-2  requirement        (EARS text, ISO tag, measured scenario)
            │    └── test               (planned → red → green, stamped with checked_rev)
            ├── FEAT-058  defect        violates: FEAT-046/R-2   introduced_by: FEAT-046
            ├── design/mirror.md        refs: [FEAT-046, R-2, G-2]
            ├── ADR-0003                affects: [FEAT-046]  driven_by: [FEAT-046/R-2]
            └── code / commits          // … (FEAT-046 R-2)  ·  Refs: kanbanr:FEAT-046/R-2

Three rules keep it from rotting:

  1. The manifest is canonical — board yaml, document front-matter, and the commit trailer. An id that does not resolve is an error, like a dangling dependency.
  2. Inline annotations are a derived convenience — (FEAT-046 R-2) on the module or function that owns the behaviour. They survive the refactors that destroy git blame; they are never the only record.
  3. Views are derived, never stored (ADR-0002). kanbanr trace --json generates the traceability manifest for CI or an audit; nothing writes it back. A stored manifest would be a third copy of links that already exist, and the copy that goes stale first.

Modules

ModuleWhat it owns
charterthe project’s purpose and goals — a side file, absent by default
earsthe five EARS patterns and the nine ISO/IEC 25010 characteristics; classifies, never rejects
doctorevery structural check, all warnings except broken references; scoped so it stays readable
reportflow and quality derived from history, defects and test states
retroa wave’s account, with changelog-derived spans reported apart from measured ones
lessonswhat was learned, with confidence that decays unless reaffirmed
scmthe trailer grammar, branch naming and reference validation
adrdecisions as documents with front-matter; supersede is the one two-sided link
tracethe downward chain and its gaps, and the derived Zachman view
query, graph, gantt, portfolio, mirror, eventingsearch, dependencies, scheduling, rollups, the GitHub mirror, notifications
validate, hash, error, docsid generation, stable hashing, error taxonomy, the doc tree

Two deliberate asymmetries

Approval is pinned to content, not to time. definition.approval.rev is a stable hash of the definition with the approval itself and the test states excluded — recording evidence must not lapse an approval, but changing scope must. Editing the definition after a yes therefore reports “approval lapsed”, which is a different thing from “never approved”.

The gates refuse two things and warn about everything else. A reference that names something the board does not have, and a commit that names nothing, are refused — both fixable in the message the author is already writing. Everything else warns, because a check that blocks legitimate work gets bypassed wholesale (ADR-0004), and a check that fires on everything gets ignored.

Workflow contract (how Claude uses it)

kanbanr is designed to be the single system of record for a project’s activity — the only project information that stays outside it is the raw conversation transcript. The skill (skill/kanbanr/SKILL.md) encodes the behavioral contract: adopt kanbanr for the whole project on one trigger phrase (“start using kanbanr for this project”); never track work in an ephemeral/in-session list (use persistent todo-lists on feature items); recover/resume state from kanbanr at the start of each session; keep it updated before and after every task; review a feature’s spec for staleness when moving it out of Deferred; never delete feature items (move them, e.g. to a no-op state); model every kind of work as a work item (feature/chore/recurring, ongoing items in a non-displayed status); and prefer one batch call to bundle changes. The durable, file-backed data model makes the project resumable across sessions by design.